Installation
Use in conjunction with standard industry practices, where a laser, transit or similar method is used to grid the floor.
Once the substrate is prepped and primed, the pins are placed in a grid pattern and trimmed to the appropriate height. Self-leveling concrete is then poured to the top of the pins to achieve the desired elevation. The pins will not float once installed, and become an invisible part of the matrix.