Residential and Office Building
Projects
Elevate Apartments, Wellington
Builder: Stratum Management Ltd
Architect: Architecture Plus
Installer: K & R Wake Tiling Limited
Elevate Apartments, a 15 storey apartment complex in central Wellington, includes ARDEX products for floor levelling, acoustic soundproofing, undertile waterproofing, exterior waterproofing and tiling. This complete System ARDEX solution ensures all products are designed to work together for maximum performance.
The Stratum Management Ltd apartment complex was designed by Architecture Plus and completed in August 2014. Elevate Apartments offer one, two or family-sized three bedroom apartments. Bathrooms, kitchens and common areas feature both horizontal and vertical tiled surfaces creating a total of 2500m² of tiled area. The lobby and lift foyers also feature floor and wall tiling.
Dave Stewart of Stratum Management Ltd prefers to create strong relationships with the companies he works with on construction projects and has worked with ARDEX on at least 20 major projects. He specifies ARDEX products with confidence as they are ‘tried and tested’ and the technical back-up ensures that ARDEX ‘stands behind their product’. Dealing with one manufacturer for multiple applications makes the process easier and Dave has also found contractors like to work with ARDEX products.
In order to reduce the noise between floors, ARDEX DS 40 sound reduction membrane was installed as part of the floor tiling system. ARDEX LQ92 was laid as the floor levelling compound and the soundproofing was installed on top and adhered with ARDEX X56. Tiles can be installed directly over the ARDEX DS 40, meaning the floor installation time is reduced.
In each of the 82 bathrooms, ARDEX WPM 001 and WPM 002 acrylic waterproofing membranes have been used along with ARDEX X 56 adhesive for floor tiling and ARDEX MPP for wall tiling. Further soundproofing was included in the bathroom floors over the undertile waterproofing membrane. All of the tiled areas were finished with ARDEX FS-DD grout and ARDEX SE Silicone or ARDEX ST neutral cure silicone.
ARDEX Butynol was chosen as the waterproofing membrane for the balconies at Elevate Apartments. ARDEX Butynol has a proven track record in New Zealand providing resilience and dependability when it comes to membrane waterproofing and the Dove Grey colour suited the exterior colour scheme.
Elevate Apartments is just one of 20 Stratum Management Ltd projects which include complete System ARDEX solutions. The System ARDEX concept incorporates system recommendations, on-site visits and technical support and warranties, as well as complete product systems designed for reliability.
Products used for this project
-
ARDEX LQ 92
Undertile Levelling Compound
- Can be walked on & tiled over after 4 hours
- Polymer modified
-
ARDEX X 56
Highly-Flexible Tile Adhesive
- Fast setting - grout after 4 hours
- Suitable for early age concrete
-
ARDEX WPM 001
One-Component Undertile Waterproofing Membrane
- Single component undertile waterproofing membrane
- Fast drying one part acrylic membrane
-
ARDEX WPM 002
Rapid-Drying, Two-Part Undertile Waterproofing Membrane
- Advanced acrylic – will not re-emulsify
- Rapid drying time
-
ARDEX MPP
Multipurpose Tiling Adhesive
- Fast drying – grout after 4 to 6 hours
- Suitable on a range of substrates
-
ARDEX FS-DD
Narrow Joint Grouting Compound for Joints 1-4mm
- Contains ARDEX Grout Shield to combat mould growth
- Water repellent - special hydrophobing agent
-
ARDEX SE
Flexible Acetic Cure Silicone Sealant
- Flexible sealant for tile movement & connecting joints
- Withstands 25% total movement of joint width
-
ARDEX ST
Neutral-Cure Silicone Sealant
- Contains fungicides to combat mould growth
- UV and weather resistant
-
Butynol®
Roofing and Tanking Membrane
- Resists ageing from heat, sunlight and ozone
- Excellent gas impermeability and toughness
More projects in Flooring
-
WAI ARIKI HOT SPRINGS & SPA
Wai Ariki is a luxury spa and wellness centre based on the shores of Lake Rotorua.
-
Heathrow Airport
A 40,000m² flooring refurbishment of Heathrow Airport’s Terminal 1
-
Aotea Center
Crushed Italian Marble Used In Customised ARDEX PC-T Floor Installation
-
Air New Zealand Head Office
ARDEX Specifed For High End Remedial Project
-
SO/Auckland Hotel
SystemARDEX specified for a luxurious, high-end hotel complex
-
Fiji Marriott Resort Momi Bay
New Luxury Resort Receives the SystemARDEX Treatment
-
The British Museum, UK
ARDEX provide The British Museum with a floor built to withstand its ever increasing popularity
-
2014 Commonwealth Games Swimming Pool, Glasgow
Tollcross International Swimming Centre
-
Elevate Apartments, Wellington
-
MERCEDES BENZ AUTOHAUS, NEWSTEAD
ARDEX System Specified for Unique 32,000m² Auto Dealership
-
University of Canterbury – The Core, Christchurch
-
Westfield Miranda, Sydney
ARDEX specification chosen for project requiring quick turnaround
-
The Emporium, Melbourne
21,000 sqm of tiling completed using ARDEX adhesive and grout
-
Bresic Whitney Offices, Sydney
ARDEX screed and PANDOMO specified in time sensitive project
-
Government Building, 1 William Street, Brisbane
ARDEX binder and screed used to repair damage to high traffic area
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower