Opera House Western Foyer, Sydney
INSTALLER: Better Tiles
BUILDER: John Holland
ARCHITECT: Original Architect: Jørn Utzon & son Jan Utzon
COLLABORATOR: Johnson Pilton Walker
CHALLENGES:
- Reproducing Jørn Utzon’s original vision
- Irregular shaped glass reinforced concrete tile was produced specifically for the project the first of its kind in Australia, as Jan Utzon wanted a seamless floor finish construction while building was being used
- Floor movement from stages & loading docks underneath foyer
- Silicone used in perimeter & expansion joints needed to match the floor to create a seamless look
PROBLEMS:
Design improvements included irregular tile shapes & glass reinforced concrete tiles with clear silicone expansion joints to create a seamless floor. Frequent floor movement was expected because of the stage & loading docks below the foyer, which could potentially cause the tiles to crack.
SOLUTION:
To prepare the original substrate for the new tile installation, ARDEX recommended ARDEX Multiprime Water Based Primer which is designed to improve adhesion of ARDEX products to various porous substrates. This primer dries fast allowing subsequent products to be installed quickly.
When applying the screed, ARDEX Abacrete Bonding Agent was specified. It is a liquid polymer additive that greatly improves the shear & tensile bond strength of the screed.
To place the specialty tiles, ARDEX X 77 high performance, fibre reinforced polymer modified adhesive was used in addition to ARDEX E 90 Admix for Cement Based Tile Adhesives. ARDEX X 77 is reinforced with ARDEX Microtec ® Technology. The combination of these two products enhances bond strength for use in high volume foot traffic areas. When mixed with the ARDEX E 90 additive, it has water repellent qualities & improved sag resistance. By using the combination of the two products together, the specialty tiles were less likely to move while the adhesive was drying, maintaining an even surface.
ARDEX SE Coloured Silicone for Sanitary Installations was used to fill perimeter, expansion joints and ARDEX Abapoxy High Performance Epoxy Grout was sprinkled over the silicone for a matt finish. This enhanced the seamless look of the tile installation. To grout the rest of the area, ARDEX Abapoxy was selected for its permanent colour capabilities. It also has a high resistance to chemicals, so commercial cleaning required for a high traffic area would not have an adverse effect on the grout.
Each of the ARDEX products used were low in VOC, allowing the Sydney Opera House to remain open during the installation.
Products used for this project
-
ARDEX Abacrete
Bonding Agent for Screeds & Renders
- Can be used in bonded and unbonded applications
- Accomodates thermal movement
-
ARDEX X 77
Premium Microtec Tile Adhesive
- Reduced effect of shear strain and stress on tiling systems
- Microtec Technology improves adhesive strength
-
ARDEX E 90
Dispersion Additive for Cement-Based Tile Adhesives
- Improves adhesion and imparts flexibility
- Allows direct fixing over existing tiles
-
ARDEX Multiprime
Water-Based Primer
- Quick drying - apply subsequent products sooner
- Improves adhesion to various substrates
More projects in Leisure
-
WAI ARIKI HOT SPRINGS & SPA
Wai Ariki is a luxury spa and wellness centre based on the shores of Lake Rotorua.
-
Retrofit Membrane Roofing at The Palms Shopping Centre
-
PAPAMOA SURF RESCUE BASE
-
COASTAL RESIDENTIAL HOME, OMAHA
Heat Welded Membrane Roof Offers Trusted Durability
-
Aotea Center
Crushed Italian Marble Used In Customised ARDEX PC-T Floor Installation
-
Rydges Hotel Wellington Airport
A Fantastic Addition to Wellington's Accommodation Scene
-
SO/Auckland Hotel
SystemARDEX specified for a luxurious, high-end hotel complex
-
Hugo’s Bistro
Hitting the floor in style
-
Fiji Marriott Resort Momi Bay
New Luxury Resort Receives the SystemARDEX Treatment
-
The British Museum, UK
ARDEX provide The British Museum with a floor built to withstand its ever increasing popularity
-
London 2012 Aquatic Centre
866,000 tiles were fixed in the London Aquatics Centre
-
2014 Commonwealth Games Swimming Pool, Glasgow
Tollcross International Swimming Centre
-
Hagley Oval, Christchurch
-
Knox Presbyterian Church, Christchurch
-
Te Wharewaka O Poneke, Wellington
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Opera House Western Foyer, Sydney
ARDEX adhesive, grout and primer used at Sydney Opera House
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
The Vibe Hotel, Canberra
5000 sq. metres of ARDEX tile adhesive was used for The Vibe Hotel